No Results Yet
Upload MCC data, choose a plant, configure parameters, then run the optimizer. Results will download automatically as Excel.
Total MCCs
—
— covered
— unserved
Total Routes
—
active truck routes
Total Cans
—
milk cans collected
Total Load
—
kg collected
% Utilization
—
avg fleet capacity used
Total KMs
—
fleet distance
🗺️ Route Map
Waiting for results…
Total MCCs
—
— covered
— unserved
Total Routes
—
active truck routes
Total Cans
—
milk cans collected
Total Load
—
kg collected
% Utilization
—
avg fleet capacity used
Total KMs
—
fleet distance
🗺️ Route Map
Waiting for results…
📍 MCC → Plant Assignment (by OSRM driving distance)
| MCC | Name | Assigned Plant | Distance |
|---|